Another excellent Article from Rigoberto Tiglao on the South China Sea (SCS) Issue. It covered a lot of ground, things which most of the Dilawan and Pro-American Philippine Press refuses to tell to the Filipino People. A Must-Read for everyone
Let me try to summarize some of the points of the Article:
* The Malampaya-Camago Gas Field provides 20% of the Philippines’ overall Power requirements, it has been operating since 2002 but will be depleted by 2024. There are no solid alternatives yet as of now regarding this situation.
* The Sampaguita Field in Reed Bank could be tapped, but this will only be possible thru a Joint Agreement with China.
* Deng Xiaoping since his rule in the 1980s has established the Doctrine of Joint Development in the SCS which China continues to pursue up to now.
* In 2011, the First Pacific Company deployed a Vessel to try to explore Sampaguita Field, but were driven away by China. Former President AbNoy Aquino’s Foreign Secretary Albert Del Rosario is an Official of First Pacific.
* First Pacific’s Php 25 billion investment into the Energy Sector is now in danger because of its inability to drill in the SCS.
SOURCE: Revealed: The Crux of our SCS Dispute — Natural Gas {Archived Link}
Check out my Links: https://linktr.ee/rhk111
Don’t forget to click on the Ads or to donate to help support this Website
No comments:
Post a Comment