The new North Cotabato and Zamboanga Airports in Mindanao, Photos by the Mindanao Development Authority (MinDA) |
Two new Airports are planned for Mindanao, one is the Central Mindanao Airport located in North Cotabato which costs Php 150 million and is already 27% complete. It is expected to open before the end of President Rodrigo Duterte’s term in 2022.
The other is the new Zamboanga International Airport worth Php 13.9 billion which will be built at a new location. It is expected to start construction in 2021 and will have a Terminal, Control Tower, six Jet Bridges and a 3,440 m long Runway.